Around hydro stations, dams and
surrounding waterways.
Ontario Hydro constructed a dam in 1963 across the Little Abitibi River. At the same time, they also built diversion canals from the headpond to Worobec Lake and from the Worobec Lake to New Post Creek. New Post Creek flows into the Abitibi River upstream of Otter Rapids GS. The dam consists of a timber crib dam with 10 stoplog sluices and two earth filled dykes.
DATE |
WATER LEVEL (m) |
FLOW (m3/s) |
---|---|---|
Dec. 20, 2024 | - | - |
Dec. 19, 2024 | - | - |
Dec. 18, 2024 | - | - |
Dec. 17, 2024 | - | - |
Dec. 16, 2024 | - | - |
Dec. 15, 2024 | - | - |
Dec. 14, 2024 | - | - |
Data Disclaimer Statement:
The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.
Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.