Mistinikon Lake Control Dam

The Mistinikon Lake Control Dam, also known as ‘Big Bend’, is located on the Montreal River at the outlet of Mistinikon Lake, approximately 14.5 km northwest of the town of Matachewan. The dam controls Mistinikon Lake flow into the Montreal River 38 km upstream of Chute GS. Mistinikon Lake Dam is preceded by Duncan Lake Dam on this river system and was originally built in 1922.

SCROLL DOWN

If you have any questions or comments about this site or the data on this page, please contact us.

Last 7 Days table
DATE

WATER LEVEL (m)

FLOW (m3/s)

Sep. 18, 2024--
Sep. 17, 2024--
Sep. 16, 2024--
Sep. 15, 2024--
Sep. 14, 2024--
Sep. 13, 2024--
Sep. 12, 2024--
Reading Type
Water Levels (m)
Outflow (m3/s)
Your browser does not support the canvas element.
Apply Filters
no changed - no date
OPG - Water

Data Disclaimer Statement:

The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.

Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.

Stay clear, stay safe

Around hydro stations, dams and
surrounding waterways.