Kipling Generating Station is located on the Mattagami River downstream of Harmon GS. Constructed in 1966, it is the last power plant built in the series of cascading power facilities on the lower Mattagami River. It is operated as a peaking facility and has three generating units with a maximum generating capacity of 230 MW. The concrete dam is terminated by earth dams which extend to the natural soil banks at each side of the river.
DATE |
WATER LEVEL (m) |
FLOW (m3/s) |
---|---|---|
Oct. 06, 2024 | - | - |
Oct. 05, 2024 | - | - |
Oct. 04, 2024 | - | - |
Oct. 03, 2024 | - | - |
Oct. 02, 2024 | - | - |
Oct. 01, 2024 | - | - |
Sep. 30, 2024 | - | - |
Data Disclaimer Statement:
The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.
Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.