Around hydro stations, dams and
surrounding waterways.
Big Eddy Generating Station is located on the Musquash River in the Town of Bala, approximately seven km downstream from Ragged Rapids Generating Station. The station has two units with a maximum generating capacity of 8 MW and began operating in 1941.
DATE |
WATER LEVEL (m) |
FLOW (m3/s) |
---|---|---|
Oct. 06, 2024 | - | - |
Oct. 05, 2024 | - | - |
Oct. 04, 2024 | - | - |
Oct. 03, 2024 | - | - |
Oct. 02, 2024 | - | - |
Oct. 01, 2024 | - | - |
Sep. 30, 2024 | - | - |
Data Disclaimer Statement:
The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.
Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.