Summit Control Dam

The Summit Control Dam is located on the Nipigon River system and was constructed in 1941. This dam regulates the diversion of water from the Ogoki Reservoir to Lake Nipigon through the Little Jackfish River.

SCROLL DOWN

If you have any questions or comments about this site or the data on this page, please contact us.

Last 7 Days table
DATE

WATER LEVEL (m)

FLOW (m3/s)

Dec. 20, 2024--
Dec. 19, 2024--
Dec. 18, 2024--
Dec. 17, 2024--
Dec. 16, 2024--
Dec. 15, 2024--
Dec. 14, 2024--
There was a flow change completed at the Summit Dam on June 24, 2023 to increase the flow from 138 m3/s to 280 m3/s.

7 Day Ahead Flow Forecast: 45 m3/s - 65 m3/s.
Reading Type
Outflow (m3/s)
Your browser does not support the canvas element.
Apply Filters
no changed - no date
OPG - Water

Data Disclaimer Statement:

The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.

Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.

Stay clear, stay safe

Around hydro stations, dams and
surrounding waterways.