Aguasabon Generating Station

Aguasabon Generating Station is located on the Aguasabon River system on the north shore of Lake Superior. This peaking station went into service in 1948 and has two units with a maximum generating capacity of 47 MW.

The intake for this facility is located on Hays Lake, approximately four km west of the Hays Lake Control Dam.

SCROLL DOWN

If you have any questions or comments about this site or the data on this page, please contact us.

Last 7 Days table
DATE

WATER LEVEL (m)

FLOW (m3/s)

Dec. 20, 2024--
Dec. 19, 2024--
Dec. 18, 2024--
Dec. 17, 2024--
Dec. 16, 2024--
Dec. 15, 2024--
Dec. 14, 2024--
There was a flow change completed at the Hays Lake Dam on Nov 28, 2024 to decrease the flow to 0m3/s.

7 Day Ahead Water Level Forecast: 273.40m - 274.10m.

7 Day Ahead Flow Forecast Aguasabon GS: 5 - 30 m3/s.

7 Day Ahead Flow Forecast Hays Lake Dam: 0 m3/s.
Reading Type
Water Levels (m)
Outflow (m3/s)
Your browser does not support the canvas element.
Apply Filters
no changed - no date
OPG - Water

Data Disclaimer Statement:

The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.

Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.

Stay clear, stay safe

Around hydro stations, dams and
surrounding waterways.