Around hydro stations, dams and
surrounding waterways.
Harmon Generating Station is located downstream of Smoky Falls GS on the Mattagami River and began operating in 1965. The station has three units with a maximum generating capacity of 234 MW and is operated as a peaking facility. The dam is made of concrete, terminating in earth fill extensions at either side of the river.
DATE |
WATER LEVEL (m) |
FLOW (m3/s) |
---|---|---|
Oct. 06, 2024 | - | - |
Oct. 05, 2024 | - | - |
Oct. 04, 2024 | - | - |
Oct. 03, 2024 | - | - |
Oct. 02, 2024 | - | - |
Oct. 01, 2024 | - | - |
Sep. 30, 2024 | - | - |
Data Disclaimer Statement:
The enclosed information is being released to you for reference purposes only. No part of this information may be produced, published, converted or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc.
Neither Ontario Power Generation Inc. nor its subsidiaries, employees, officers, directors or agents makes any representation or warranty, express or implied, as to the accuracy or correctness of the enclosed information and disclaims any and all liability for any consequences as a result of, or in any way related to, the reproduction or use of this information in whole or in part.